高速隔离墩模具产品的重要作用

[关闭该页][设为首页][添加收藏][发送朋友][打印][ ]

高速隔离墩模具是我们在道路上使用的非常频繁的模具,因为这种模具生产出来的产品是保护道路的安全的,所以我们在生产制作的时候,一定要注意这种模具产品的质量。下面我就来具体介绍一下他的作用。这种水泥隔离墩模具生产制作的产品一般设立在道路的中央,主要用来隔离车流的,因为在一个道路上,一般至少会有两个车道,行驶的方向是不一样的,所以我们为了保证道路交通的安全,必须在中间设立一种隔离的设备,所以这种水泥隔离墩模具生产制作的隔离墩也就发挥了作用。

High speed isolation pier mold is a mold that we use very frequently on the road, because the products produced by this mold are to protect the safety of the road, so we must pay attention to the quality of the mold products when we produce. Let me introduce his role in detail. This kind of cement isolation pier mold production products are generally set up in the middle of the road, mainly used to isolate the traffic flow, because on a road, there are at least two lanes, and the driving direction is different. Therefore, in order to ensure the safety of road traffic, we must set up a kind of isolation equipment in the middle, so this kind of cement isolation pier mold production and production of the partition Leaving the pier also plays a role.

高速公路上设立了隔离墩之后,行驶者在行驶的时候,就不会随意的转换车道,而且行人也不能随意的横穿马路,这样可以避免很多的交通意外。我们利用水泥隔离墩钢模具生产制作的产品在形状上是非常的特殊的,产品的形状并不规格,是一种上小下大的形式,这样的结构使得整个产品的重心向下偏移,所以这种模具生产制作的产品在道路上上设立的时候是非常具有稳定性的,就算经过碰撞,也是不会倒下的。

After the isolation pier is set up on the expressway, the driver will not change lanes at will when driving, and pedestrians can not cross the road at will, which can avoid a lot of traffic accidents. The shape of the products produced by the steel mold of the cement isolation pier is very special. The shape of the product is not standardized. It is a form of small top and large bottom. This structure makes the center of gravity of the whole product shift downward. Therefore, the products produced by this mold are very stable when they are set up on the road. Even after collision, they will not fall down Yes.

隔离墩模具具体的厚度需要调整公路防撞墙模板的顶部的拉杆,每次生产的时候调整墙体厚度的话必须将所有的拉杆进行调节。之后在模板的两侧使用钢板或者是特定的零件进行阻隔,接下来便是可以进行泥浆的浇筑了,大量的混凝土通过管道快速的填满模板之间,震动过后一些位置的泥浆平面就会下降,自然就需要再去填充一些泥浆,气泡排除干净之后就能够进行晾晒了,等到泥浆彻底凝固后就需要拆开钢模板就可以了。

The specific thickness of the isolation pier mold needs to adjust the top pull rod of the highway anti-collision wall template, and all the pull rods must be adjusted every time the wall thickness is adjusted. After that, steel plates or specific parts are used to block the two sides of the formwork. The next step is to pour the slurry. A large amount of concrete is quickly filled between the formwork through the pipeline. After the vibration, the slurry level at some positions will drop. Naturally, it is necessary to fill some mud. After the bubbles are removed, the air can be dried, and the mud can be completely dried After solidification, it is necessary to dismantle the steel formwork.


【上一个】 水泥隔离墩模具的制作具体要求 【下一个】 隔离墩钢模具的结构及施工特征


 · 高速隔离墩模具的使用步骤及作用 · 高速隔离墩模具产品的重要作用
 · 高速隔离墩模具的拆装步骤 · 高速隔离墩模具
 · 高速隔离墩模具 · 高速隔离墩模具的设计和拆模方法